Canada’s energy regulator green-lit a last-minute change to the Trans Mountain pipeline methodology, paving the way for the $35-billion project to finally get fully built.

  • @JeromeVancouver@lemmy.ca
    link
    fedilink
    81 year ago

    If the whole pipeline is 36" except for a small part that is 30" doesn’t that make the whole pipes throughput essentially 30"?

    • sik0fewlOP
      link
      fedilink
      41 year ago

      They’re insisting that it will still achieve the target throughput in the design. There’s a PDF linked to from the article if you can make any sense of it.